Residential, commercial, and heritage-restoration work completed by Argo. Each project page outlines the location, design context, technical requirements, and Argo's scope.
A private residence in Tbilisi, completed in 2022, with full-height glazing oriented toward an exposed hillside. Argo engineered and installed 3.75 m S700 lift-and-slide units, reinforced profiles for the calculated wind loads, an M7 curtain wall, S67 windows and doors, and an SD115 pivot entrance.
View project →
A Tbilisi office interior completed in 2019, using minimal-profile glass partitions to maintain visual continuity across the floor. Argo's scope included curved glass up to 4 m high, glass-to-glass joints, decorative glazing bars, and sandblasted panels for meeting-room privacy.
View project →
Restoration work completed in 2016 at the historic Chreli Abano sulfur bathhouse in Abanotubani, Tbilisi. Argo produced curved profiles for the glazed domes, pre-anodized and powder-coated them for the sulfur-rich environment, incorporated ventilation into the upper dome sections, and manufactured the colored and stained glazing.
View project →